CTMS

LISS CTMS — a container terminal management system. Every container on the terminal, in plain sight

Receiving from the train, tasks on tablets, stuffing, shipping and truck entry — in one system.

1C:ENTERPRISE 8.3
ANDROID TABLETS
DRIVER PORTAL · RU / KK / EN
LSSU 000412 7
S-A-03 · placed
New
S-A-03
REACHSTACKER RS-2
01 · WHY

The same yard — the difference is what is known about it

S-A-01 · stored
S-B-03 · awaiting stuffing
ZT-02 · stuffed
QUEUE BOARD
123 ABC 02 · B-3
456 KZT 05 · waiting
LIST · PRINTOUT
LSSU 000401 9
LSSU 000407 1
LSSU 000412 7 — ?
DEMU 104220 6
where is 412?
QUEUE AT THE GATE
BEFORE · printouts, a radio and a queue at the gate
⇆
02 · A CONTAINER’S JOURNEY

One container from the train to shipping

The train file becomes a list
The carrier sends an Excel file “Wagon — Container”. The dispatcher uploads it, picks the train and the date — the system creates an expected arrival of 60 containers.
The checker verifies it on a tablet
The container and wagon numbers on the tablet are checked against the real ones. A match — “Confirm”. A dent — a detailed inspection with an orange mark on the face.
The reachstacker knows where to put it
The task arrives on the tablet: where to pick it up, which container, which cell to put it into. The driver confirms the cell — and the address is known to everyone.
The order is built from the stock report
The dispatcher takes containers from the “Stock on the terminal” report, picks the train and the date — the system creates a request for every container.
The cargo list comes from the WMS
The container moves to the stuffing area. By its number the warehouse WMS returns the lots and pallets — nothing is typed by hand. Then “Done”.
Gone — and off the stock report
A move to the shipping area, the shipping document, and the container leaves on a train or a truck. The stock report no longer has that line.
01 Arrivals
02 Shipping
03 Internal operations
04 Reference data
05 Administration
Upload from file
Post
TRAIN 26-01 · 12.03.2026
Expected arrival
LSSU 000412 7
Wagon 00-001
Expected
LSSU 000418 0
Wagon 00-002
Expected
60 CONTAINERS IN TOTAL
RECEIVING / INSPECTION
LSSU 000412 7
Wagon 00-001
Inspect
LSSU 000418 0
Wagon 00-002
Accept
DEMU 104220 6
Wagon 00-003
Accept
Any damage? — dent on the corner
MOVE · REACHSTACKER RS-2
From
IN-01
Container
LSSU 000412 7
To
S-A-03
Placed
01 Arrivals
02 Shipping
03 Internal operations
04 Reference data
05 Administration
Create requests
TRAIN 26-04 · 7 REQUESTS
Shipping order
LSSU 000412 7
S-A-03
New
LSSU 000418 0
S-A-04
New
DEMU 104220 6
S-B-01
New
01 Arrivals
02 Shipping
03 Internal operations
04 Reference data
05 Administration
Fill goods from the WMS
Done
Stuffing · ZT-01
Lot 26-114
4 pallets
from WMS
Lot 26-118
6 pallets
from WMS
Lot 26-121
2 pallets
from WMS
SOURCE: WAREHOUSE WMS · REST API
01 Arrivals
02 Shipping
03 Internal operations
04 Reference data
05 Administration
Post shipping
STOCK −1
Shipping document · OUT-02
LSSU 000412 7
OUT-02
Shipped
LSSU 000418 0
S-A-04
Awaiting
DEMU 104220 6
ZT-01
Stuffed
DISPATCHER WINDOW
Expected arrival · train 26-01 · 60 containers · “Post”
03 · TRUCK ENTRY

Trucks come in by schedule, not by queue

ON SITE9 / 10
OUTSIDE PARKING · 1 WAITING
123 ABC 02
CAMERA · PLATE RECOGNISED
GATE B-3
ENTRY SLOTS · 3 HOURS, UP TO 12 TRUCKS
07–10
12/12
10–13
9/12
13–16
5/12
16–19
2/12
19–22
0/12
CTMS
RU KK EN
Vehicle registration
KZ
123ABC02
Register
Wait to be called · 3rd in the queue
SECURITY
Documents checked
Problem with documents
QUEUE BOARD
123 ABC 02ENTER · B-3
456 KZT 05WAITING
789 QRS 11CHECKING
Expected
Document check
Entry allowed
On site
Loading
Paperwork
Left
04 · WHO WORKS IN IT

Three workplaces — one system

01 Arrivals
02 Shipping
03 Internal operations
04 Reference data
05 Administration
Upload from file
Post
LSSU 000412 7
Wagon 00-001
Expected
LSSU 000418 0
Wagon 00-002
Expected

Dispatcher · 1C:Enterprise 8.3

Arrivals, shipping, internal operations, reference data, stock reports.
RECEIVING / INSPECTION
LSSU 000412 7
Wagon 00-001
Inspect
LSSU 000418 0
Wagon 00-002
Accept
DEMU 104220 6
Wagon 00-003
Accept
Confirm

Checker and equipment

Android tablet: receiving, inspection, moves. Tasks arrive on their own.
CTMS
RU KK EN
Your trip
123 ABC 02
Slot 10:00 — 13:00
Entry allowed · gate B-3
Entry rules · Request · Account

Driver and security

Web portal: registration by plate or QR, queue, document check.
05 · INTEGRATIONS

Connects to what you already have

CTMS
on the customer’s servers
REST API

Warehouse WMS

Container contents, lots and pallets by container number.
REST API

Customer ERP

Terminal operations data exchange; on one site it is SAP.
EXCHANGE

1C

The system runs on 1C:Enterprise 8.3 and exchanges data with the accounting system.
FILE

Trip planning

Trips and time slots are uploaded as a file.
VIDEO

Recognition cameras

Plates of trucks, containers and covered wagons; connected to the video recorder.
8
container statuses — from “New” to “Shipped”
3
workplaces: dispatcher, tablet, driver portal
3
languages in the driver portal: Russian, Kazakh, English
6
steps from the train arriving to shipping
06 · ROLLOUT

CTMS is a project — these are its steps

01

Terminal survey

We look at the process and map cells and zones: receiving, storage, stuffing, shipping.
02

Reference data setup

Trains, cells, equipment, user roles.
03

Tablets and the driver portal

Installing the app on tablets, launching the web portal, connecting cameras.
04

Integrations

WMS and ERP over REST API, trips uploaded as a file.
05

Training

Operator manuals in Russian and Kazakh, video, a training portal.
06

Go live

We support the first shifts on site.

What the project is made of

The number of cells and zones on the yard — it defines the markings and the reference data.
How many machines and checkers go on tablets.
Which integrations are needed: WMS, ERP, trip planning.
How many recognition cameras and where they stand.
The amount of training: shifts, manual languages, video.
Discuss a rollout
Cost

What the cost of LISS CTMS is made of

LISS CTMS is delivered as a project, so there is no price list on this page: cost and timing are worked out after the terminal survey. The total has four parts.

  1. Implementation work

    The terminal survey, marking of cells and zones, reference data, operator training and support through the first shifts on site.

  2. Integrations

    Exchange with the WMS and the ERP over a REST API, shipments loaded from a file, plate-recognition cameras connected.

  3. Licences and server

    The 1C:Enterprise 8.3 platform for the dispatcher’s workplace and the customer’s servers the system is deployed on.

  4. Equipment

    Android tablets for the vehicles and the checkers, cameras and a network video recorder. Models are chosen for the site’s conditions.

How to get an estimate
  1. Request: you tell us about the terminal
  2. Survey: the process, cells and zones
  3. Estimate of cost and timing
Request an estimate

Frequently asked questions

There is no price list: LISS CTMS is delivered as a project. Cost and timing depend on the number of zones, machines and integrations and are estimated after the terminal survey. The total is made of implementation work, integrations, licences with a server, and equipment.
The dispatcher workplace runs on 1C:Enterprise 8.3, the app for equipment is on Android tablets, the driver portal is web. Deployed on the customer’s servers.
The system runs on the 1C:Enterprise 8.3 platform and is deployed at your site. How exactly to connect it to your accounting system — we clarify during the survey.
Android tablets; specific models and requirements are chosen for the conditions on site — we clarify during the survey.
Plate recognition cameras are connected to the terminal’s network video recorder; the system receives the numbers of trucks, containers and covered wagons.
Yes. During stuffing the cargo list comes from the WMS by container number, but it can be entered manually.
Russian, Kazakh and English. Other languages can be added, for example Turkish or Uzbek.
✓
LSSU 000412 7
Shipped

We will show CTMS on your terminal

We will go through your process and show the system on your data.

BUILT BY LISS · ALMATY